SNC Lavalin

This project for SNC Lavalin consisted of three 230 ft high x 20 ft in diameter stacks weighing a total of 425 tons. The finished stacks were shipped to the Goreway Power Generation Station in Brampton, Ontario in 20 ft wide by 45 ft long sections, taking up two lanes of the 401!

Bell-Camp’s attention to detail ensured everything fit together perfectly at site and we did not incur any back charges on the entire project.

No back charges on the entire project!

“Bell-Camp Manufacturing Inc. was a valued team member in the successful execution of the Steel Stack Structure, which required detailed preplanning and a combined group effort by all parties involved to ensure a successful execution of the work.”
Rick Murray, Senior Project Mgr,
Smith Bros. & Wilson Ltd.