One of the worlds leaders in hydrogen production process technology contracted Bell-Camp to fabricate a 60' wide x 70' long x 70' high Reformer Box for a Hydrogen Plant. The fabricated unit was shipped to their customers site in Alberta, Canada in bolt together panels.
Thirty-two truckloads were required to deliver the panels which weighed a total of 400 tons and required 3000 field bolts to assemble, all of which aligned perfectly during installation!
Ralf Kühlen, our clients project manager had the following to say after the project was completed: “Our client informed us that their site personal was impressed at how well the beams and panels of the Refomer Box fit. Uhde is presently bidding on some major projects in Canada. It will be a pleasure for us to work with Bell-Camp again in the future.”
Their purchasing manager André Hinz, went on to say: “I fully agree to Ralf´s statement. I will prepare a Letter of Recommendation for you shortly”.
3000 Field Bolts perfectly aligned!