Major Cement Plant Component Construction

Bell-Camp recently completed Phase II of this large cement plant project which covered many large custom fabrications including large scale ducting, exhaust components, machine bases and much more. The entire project consisted of over 1.2 M metric tons of fabricated components and required over 250 full truck loads to site. The various components were originally designed in Europe and Bell-Camp was required to convert the designs to suite North American manufacturing standards. All of the large components were trial fit in Bell-Camps facility and then dis-assembled prior to shipment to ensure all items fit properly when re-assembled on site. This key element eliminated the high cost of quality issues the client experienced with other vendors on previous projects.

This project allowed us to truly show off our craftsmanship!!