Bell-Camp was awarded a contract to fabricate a 150' stack to replace an existing smaller stack.
Fabricated mostly from Stainless Steel, the stack had a total weight in excess of 55 tons and was shipped to Hamilton, Ontario in two pieces. A two-day, error free installation, allowed the project to be completed during the Clients short shut down period.
The stack was successfully fabricated and installed in less than 6 weeks thanks to Bell-Camp’s ability to keep the project on track from the kick-off meeting through to detailing and fabrication.
Less Than Six Weeks from Start to Finish!
View the embedded image gallery online at:
http://bellcampinc.com/featuredprojects/production-exhaust-stack#sigProId38b22c5e54
http://bellcampinc.com/featuredprojects/production-exhaust-stack#sigProId38b22c5e54