This project for SNC Lavalin consisted of three 230 ft high x 20 ft in diameter stacks weighing a total of 425 tons. The finished stacks were shipped to the Goreway Power Generation Station in Brampton, Ontario in 20 ft wide by 45 ft long sections, taking up two lanes of the 401!
Bell-Camp’s attention to detail ensured everything fit together perfectly at site and we did not incur any back charges on the entire project.
No back charges on the entire project!
View the embedded image gallery online at:
https://bellcampinc.com/featuredprojects/snc-lavalin#sigProId26201ede12
https://bellcampinc.com/featuredprojects/snc-lavalin#sigProId26201ede12